View Poll Results: Order to delivery timeline | |||
Less than 3 months | 46 | 22.66% | |
3 to 6 months | 58 | 28.57% | |
6 to 9 months | 48 | 23.65% | |
9 to 12 months | 36 | 17.73% | |
More than 12 months | 15 | 7.39% | |
Voters: 203. You may not vote on this poll |
Post Reply |
|
Thread Tools | Search this Thread |
02-04-2023, 07:02 AM | #45 |
Major General
18068
Rep 5,497
Posts
Drives: 23 X7 40i; 23 M3; 24 cooper s
Join Date: Aug 2019
Location: IL
|
I might actually start being productive at work again
__________________
2023 BMW X7 xDrive40i
2023 BMW M3 6MT 2024 Mini Cooper S Convertible '20 BMW m340i... '20 BMW X5 40i... '16 Infiniti Q50 RS 400... '10 Lexus RX 350... '08 Lexus IS 350... '00 Nissan Maxima... '93 Nissan Maxima |
Appreciate
1
vj1233793.00 |
02-04-2023, 09:17 AM | #46 | |
Lieutenant
704
Rep 489
Posts |
Quote:
Looking forward to seeing your maintenance, mods, and additional spend sheets! Haha, anyways congrats man! |
|
Appreciate
1
wtwo318067.50 |
02-04-2023, 09:36 AM | #47 |
Private
255
Rep 95
Posts
Drives: E46 M3
Join Date: Nov 2022
Location: Co
|
Model: M3 Comp Xdrive
Country, Region: USA, ordered from Texas Order in dealer bank: 7/12/22 Received allocation on: 11/16/22 Production completion date: 12/2/22(ish) Delivery date: 3/8/23 (earliest would have been 2/15/23) Special aspects (PCD, Individual exterior, etc): PCD Major delays: none that I’m aware of |
Appreciate
0
|
02-04-2023, 02:05 PM | #48 | |
Private First Class
115
Rep 132
Posts |
Quote:
|
|
Appreciate
1
wtwo318067.50 |
02-04-2023, 02:46 PM | #49 |
Major General
18068
Rep 5,497
Posts
Drives: 23 X7 40i; 23 M3; 24 cooper s
Join Date: Aug 2019
Location: IL
|
Thanks! Luckily the car is already at PCD... at this point the only thing that can delay me is a canceled flight the day before
__________________
2023 BMW X7 xDrive40i
2023 BMW M3 6MT 2024 Mini Cooper S Convertible '20 BMW m340i... '20 BMW X5 40i... '16 Infiniti Q50 RS 400... '10 Lexus RX 350... '08 Lexus IS 350... '00 Nissan Maxima... '93 Nissan Maxima |
Appreciate
0
|
02-06-2023, 06:23 PM | #50 |
Mad Linux Guru On The Loose
1130
Rep 5,400
Posts
Drives: 2008 335i Sedan, 2023 M3
Join Date: Aug 2009
Location: Chicago, IL
|
From deposit to status 111 - exactly 28 days.
|
Appreciate
0
|
02-06-2023, 06:36 PM | #51 |
Brigadier General
3793
Rep 3,626
Posts |
|
Appreciate
0
|
02-07-2023, 06:10 PM | #52 |
Captain
1448
Rep 930
Posts |
2021 M3 Manual
U.S. Midwest 3-5-21 Received Allocation Same Day That I Called Dealer To Ask If They Had An Allocation Available 3-8-21 Order Received 3-12-21 Scheduled For Production 3-22-21 Production Begins 3-29-21 Exterior Body Assembly 3-29-21 In The Paint Booth 3-31-21 Entering Assembly Line 3-31-21 Assembly In Progress 3-31-21 Quality Check 3-31-21 Final Assembly 3-31-21 Ready For Transport 3-31-21 Awaiting Carrier Assignment 4-1-21 Dispatched From Factory 4-14-21 At The Port 4-23-21 In Transit 5-9-21 At Port Of Baltimore 5-14-21 In Transit To Dealer 5-17-21 At The Dealer Last edited by LuckyBrand; 02-07-2023 at 06:18 PM.. |
Appreciate
0
|
02-20-2023, 07:38 PM | #53 |
Major General
1683
Rep 6,604
Posts |
I am “stuck” at 111 (have production number) since February 7 - two weeks. I assume that is normal?
Is Aventurin Red considered an Individual color by BMW? Thanks! |
Appreciate
0
|
02-20-2023, 07:43 PM | #54 |
Second Lieutenant
310
Rep 246
Posts |
I have been wondering the same thing.. I wouldn’t think it is considered an individual color. I went with SG. Got a production number at the same time and still waiting as well. I ordered the carbon exterior package, which I had read there were delays with. Not sure if that is cause for the delay, or this is just a normal wait time.
|
Appreciate
0
|
02-20-2023, 07:48 PM | #55 | |
Major General
1683
Rep 6,604
Posts |
Quote:
I did not get Carbon Exterior. Let’s hope it starts moving soon |
|
Appreciate
0
|
02-20-2023, 07:59 PM | #56 | |
Brigadier General
3793
Rep 3,626
Posts |
Quote:
AR is not a true individual color which needs to go through additional request and approval process. |
|
Appreciate
0
|
02-20-2023, 10:21 PM | #57 |
Major General
1683
Rep 6,604
Posts |
|
Appreciate
0
|
02-21-2023, 05:38 PM | #58 |
Major General
1683
Rep 6,604
Posts |
I just found out I am week 11 build.
Looking forward. That should put my delivery around end of May if everything goes smoothly… Order placed and Production Number received 2/7/2023 23 Aventurin Red with Silverstone 6MT Black 826 Executive Parking Assistant+ Laser Lights (shadow) Extended shadowline Ventilated seats Driving recorder Wireless charging Will be leasing. |
Appreciate
0
|
03-19-2023, 02:35 PM | #59 |
First Lieutenant
389
Rep 376
Posts |
Just ordered a manual m3 last Friday.
They told me about 5-8 months until delivery. Does that seem about right ? I’m in Florida. |
Appreciate
0
|
03-19-2023, 03:14 PM | #61 | |
Major
1578
Rep 1,439
Posts |
Quote:
Put deposit in late October, got allocation early February, which moved into 112 (scheduled for production) last week, and is supposed to be complete the week of April 10th. I think that means it'll get to me in the late May, early June timeframe. That's right around 8 months, though there's about a 6 week delay in there from the Individual color. So in theory I might have gotten it in 6-7 months if I'd gone with a standard color. |
|
Appreciate
0
|
03-19-2023, 04:02 PM | #62 |
Brigadier General
3793
Rep 3,626
Posts |
|
Appreciate
0
|
03-19-2023, 04:06 PM | #63 |
First Lieutenant
389
Rep 376
Posts |
|
Appreciate
0
|
03-19-2023, 04:56 PM | #64 | |
Brigadier General
3793
Rep 3,626
Posts |
Quote:
https://www.bimmerpost.com/forums/sh....php?t=1997584 After you get your allocation, you might face several manufacturing and logistic delays. So any timeline at this given point doesn't mean anything and you might have to take one step at a time. |
|
Appreciate
0
|
03-21-2023, 09:46 AM | #65 |
Private
19
Rep 86
Posts
Drives: 2023 BMW M3
Join Date: May 2022
Location: Maryland
|
Model: M3 Comp (non-xDrive)
Country, Region: United States, East Coast Mid-Atlantic Order in dealer bank: June 15, 2022 Received allocation on: September 28, 2022 Production completion date: Late February 2023 Delivery date: April 14, 2023 (Anticipated) Special aspects (PCD, Individual exterior, etc): Frozen Black Metallic(U91) Major delays: Not sure if this counts but the only real delay I faced was with the Performance Center delivery date confirmation, ending up having to wait an additional 4 weeks, after the factory received the car, due to Performance Center deliveries high demands. |
Appreciate
1
vmalho2703.50 |
05-30-2023, 10:09 AM | #66 |
Brigadier General
3793
Rep 3,626
Posts |
Total votes - 167
Less than 3 months - 22.16% 3 to 6 months - 28.14% 6 to 9 months - 23.95% 9 to 12 months - 17.96% More than 12 months - 7.78% |
Appreciate
2
AlpineWhiteG80m3149.00 twilight.m3190.50 |
Post Reply |
Bookmarks |
|
|