Originally Posted by vj123 View Post
Looks like logistics gods are not on my favor. Sat in factory for 5 days before i got on to a train to Bremerhaven. Since then, i have been sitting on the port for the past 3 weeks and missed 5 ships which left to my destination. Its weird that few vehicle builds in the same build week didnt see any of the delays. This delay is nothing compared to several other issues reported here, so i should be good.

1/11 - Order in dealer bank (47)
1/24 - Order accepted, scheduled for CW11 (111)
2/07 - Order accepted, scheduled for CW10 (111)
2/09 - Scheduled for Production, CW9 (112)
2/16 - Production begins (150)
2/24 - Exterior body assembly begins (151)
2/25 - In paint booth (152)
2/28 - Entering Assembly Line (153)
2/28 - Assembly in process (154)
3/01 - Quality check
3/02 - Production completed (155)
3/02 - Ready for transport
3/02 - Awaiting carrier assignment
3/07 - Dispatched from factory (190)
3/11 - At port
You're on the home stretch. I'm still amazed (and slightly jealous) at the turnaround time between order placed and getting your allocation.
__________________
2023 BMW X7 xDrive40i
2023 BMW M3 6MT
2024 Mini Cooper S Convertible

'20 BMW m340i... '20 BMW X5 40i... '16 Infiniti Q50 RS 400... '10 Lexus RX 350... '08 Lexus IS 350... '00 Nissan Maxima... '93 Nissan Maxima
Appreciate 2
vj1233790.00