Quote:
Originally Posted by evilalien
Quote:
Originally Posted by chicagofan00
For the first time I Googled what Week 39 meant and noticed that there are two different ways of calculating it, American and European. Funny thing is when calling the Genius line I've been told both weeks. I would assume that these things really are on the European method of calculating.
Perhaps this is the driver behind the confusion of what the build week actually means?
|
What. The. Hell.
In any case, not sure how accurate it is in any case. My production, which was a "week 39" started early and is now in status 155 "Assembly finish / quality check" as of 08.09.2021. I really appreciate the ambiguous date format, which is really due to the US being weird. I assume that isn't US date format with month first and means 2021.09.08, i.e., September 8th.
|
Mine still seems to be tracking towards week 39 as of right now. I've called both last week and this week and they've remained firm on the week 39 designation and the tracker still has me at 112 status.
What a cluster this has been!