View Single Post
      09-10-2021, 01:18 PM   #67
evilalien
Lieutenant
evilalien's Avatar
Canada
451
Rep
587
Posts

Drives: MY22 M3 Competition xDrive
Join Date: Dec 2016
Location: Canada

iTrader: (0)

Quote:
Originally Posted by chicagofan00 View Post
For the first time I Googled what Week 39 meant and noticed that there are two different ways of calculating it, American and European. Funny thing is when calling the Genius line I've been told both weeks. I would assume that these things really are on the European method of calculating.

Perhaps this is the driver behind the confusion of what the build week actually means?
What. The. Hell.

In any case, not sure how accurate it is in any case. My production, which was a "week 39" started early and is now in status 155 "Assembly finish / quality check" as of 08.09.2021. I really appreciate the ambiguous date format, which is really due to the US being weird. I assume that isn't US date format with month first and means 2021.09.08, i.e., September 8th.
__________________
Quote:
evilalien
Current: MY22 M3 Competition xDrive; Canadian Ultimate Package (-carbon bucket seats, CF trim); Santorini Blue; Fjord blue/black full leather
Appreciate 1
chicagofan0019155.00