I've been at 150/"production begins" for 5 days now - is it normal to be there that long?
|
Yes. Just means that the parts are being lined up with the 1st tier OEM's for just in time factory sequence delivery. Remember that the engine needs to stamped with the VIN, which all M engines were assembled in Munich, but this production was being shifted to Austria.
Maybe taking longer in the COVID age, but be great full for status 150, as others are being bumped backwards to 111.