Quote:
Originally Posted by Ezra168
BMW M4- Frozen Black
9/28/24: paid deposit
10/19/24: got a production number status 111
10/22/24: put in status 102
10/27/24: back to 111 status special order color showing on my bmw
11/24/23: status 112
12/5/23: status 150; Production begins;
12/15/23: status 151: exterior body assembly begins
12/18/23: status 152 — In The Paint Booth
1/10/24: status 153-155
1/11/24: status 182 awaiting carrier assignment
1/12/24: status 190 dispatched from factory
1/15/24: status 193 at the port
Hope that helps
Was telling Ashwin that my production day was 1/11/24, apparently that’s the date it’s suppose to be completed.
|
Thanks man. Currently awaiting carrier assignment just wanted to see how long this status takes. Love the paint choice btw!