View Single Post
      07-10-2021, 03:41 AM   #17
Sbm007
Captain
Sbm007's Avatar
United Kingdom
614
Rep
824
Posts

Drives: G80 M3CX (Oxide Grey)
Join Date: Nov 2014
Location: Glasgow, UK

iTrader: (0)

Garage List
I'm actually Week 36 (status 111) but I hope it gets moved up to Week 34 or Week 35 closer to the time.

From what I've seen so far on these forums, when your build goes status 112 (typically 4 weeks before your estimated build week), that's when it's most likely to change build weeks too, usually by a week or two (either brought forward or pushed back).

So for most of us I think around Week 31/32 (1st week of August) our builds should lock into status 112 and then the system will give us a more accurate build week.

G80 M3 Competition AWD (UK spec)
Oxide Grey
Black Full Merino Leather
826M Bicolour Alloy Wheels
Red Calipers
M Carbon Exterior Styling
Carbon Fibre Interior Trim
Laserlights
Heated Steering Wheel
Electric Bootlid
Comfort Access
M Drive Professional
Parking Assistant Plus
Head-Up Display
Drive Recorder
Gesture Control
Blow-by heater
Galvanic Controls
BMW Individual Lights Shadow Line
High-gloss Shadowline Exterior Trim
BMW Individual high-gloss Shadow Line with extended contents
__________________
Gone:
2011 E90 318d (Alpine White) • 2016 F83 M4 (Mineral White) • 2019 F83 M4 Competition (Sapphire Black)
Current:
2022 G80 M3 Competition M xDrive (Oxide Grey)

Last edited by Sbm007; 07-10-2021 at 03:49 AM..
Appreciate 0