View Single Post
      09-23-2021, 08:35 PM   #370
BGM-M3COMP
The Ben Shapiro of this place. I never lose! LOL
BGM-M3COMP's Avatar
2328
Rep
3,021
Posts

Drives: 12 plaids on order
Join Date: Aug 2021
Location: Tesla Land

iTrader: (0)

Garage List
Quote:
Originally Posted by luckylingy View Post
I too was scheduled for Week 40, went into “production begins” September 16 (VIN assigned that day), and that VIN has been scanned 3 times so far (which the Genius agent believes it’s in the paint shop, even though these days the system isn’t updating production status each step of the way). Completion remains October 4.

So I’m either still Week 40 or bumped up to Week 38, depending on whether the week designates when production is completed or begun.

FWIW, no carbon bucket seats or parking assistance; bi-color 825s.

I was told by genius that whatever build week any of us was assigned to, is the START of the build. Meaning that's the time frame we get the VIN, or status 150?

So if we were assigned a VIN sept 16/17, it's safe to say that we got bumped UP from week 40 to week 38 or 39 whatever sept 16/17 falls under.

The only thing i really care about is getting the car by halloween by chance?

Or is it still looking like thanksgiving?
Appreciate 0