Originally Posted by Dirtbikerr450
Just for an example. I got my allocation 1/6/23. The car was built and left the assembly line 3/1/23 and is currently on a boat and should be at port roughly 3/31/23. I was extremely lucky to only be waiting on a boat for 1 week. The boat ride depending on destination port is anywhere from 2-3weeks for east coast. For me it has taken 3 weeks on a boat to Brunswick GA. Doing PCD.
|
Similar timeline for my car:
I was at status 111 (Order Accepted) in late November, status 112 (Scheduled for Production) in late December. Production was around last week of Jan/ first week of February. I was asked for my desired PCD dates mid February. Shipping took about 3 weeks for mine as well.