This means no change from 150 until that date? So I can stop loging every day/multiple times a day 😂😂😂
|
The prod date is when your build is supposed to be *completed*, so you should start moving through the line 1-2 business days before that. For reference, an M8 I was tracking with a prod date of 8/31 started moving through the line on 8/29 and was dispatched from the factory on 8/31 as planned. I wouldn't expect anything until 2 days or so before the prod date.